VUL HET FORMULIER IN OM EEN E-MAIL TE STUREN

Velden die gevolgd worden door * hebben betrekking op verplichte gegevens en MOETEN worden ingevuld *
BERICHT
EXPO Milano 2015 Construction Site
Opslaan in uw lijst
Afdrukken

EXPO Milano 2015 Construction Site

OMSCHRIJVING

A task which required seriously impressive organisational and logistical skills. In an operational environment of this nature, reliability and performance requirements in terms of energy distribution reach the very highest levels. GEWISS was selected as the ideal partner to assist with the project throughout the entire life of this impressive construction site, largely due to the company's ability to ensure a comprehensive supply of solutions to meet every requirement: fixed and mobile distribution boards, detachable socket-outlets and plugs, cable winders, waterproof containers for electro-technical equipment and much more. The urgent time-frames imposed by the site and the characteristics of many of the elements being built really put all of the suppliers to the test, and saw them working together to ensure the deadlines were met.

GALERIJ

PRODUCTEN

Infrastructuren Contexts

Infrastructuren

De bouw van complexe infrastructuren vereist bijzonder hoge normen in de beginfasen van de bouw om een optimale start van het project te garanderen. De unieke oplossing van GEWISS voor bouwwerven, bestaande uit consoles en verlichtings- en signalisatieapparatuur, kan een optimale elektrische en esthetische coördinatie garanderen, evenals een hoog veiligheidsniveau onder alle omgevingscondities.

Profiling
Uw oplossingen op maat
PRODUCTEN EN OPLOSSINGEN VOOR AL UW BEHOEFTEN
Fout bij sturen van verzoek.
Probeer later opnieuw!
Dank u!
Uw aanvraag is met succes verstuurd