REMPLISSEZ LE FORMULAIRE POUR ENVOYER UN E-MAIL

Les champs repérés par un astérisque sont obligatoires *
MESSAGE
''Angelo Quarenghi'' Municipal Stadium
Enregistrer dans votre liste
Imprimer

''Angelo Quarenghi'' Municipal Stadium

DESCRIPTION

On the San Pellegrino pitch, the previous midfield lighting only emitted 50 lux of light, while near the corners, this level was just 30 lux. After installing seven twomodule Smart [PRO] led devices, a much more uniform lighting result was achieved, with a more realistic light quality. The end result: the amount of light across the entire surface of the pitch has been tripled, and energy consumption has been slashed by two thirds.

GALERIE

PRODUITS

"Sa Suergera" Municipal Stadium Projects

"Sa Suergera" Municipal Stadium

Girasole is a small coastal town in Ogliastra, in central-eastern Sardinia. The island's town is set apart from the sea by the Tortolì lake, a local wildlife area, an attractive setting for the Municipal Stadium "Sa Suergera". The stadium’s pitch has recently had a new lighting system by GEWISS installed, 32 Smart [PRO] 2 LED module floodlights, which provide excellent and uniform light in any weather conditions.

Sedriano Municipal Sports Centre Projects

Sedriano Municipal Sports Centre

A.C.D. Sedriano is an amateur football club playing in the first Milanese provincial division. On one of the pitches used by the first team at the town's municipal sports centre, Digital Sport Innovation stepped in to overhaul the entire lighting system. There are now 32 Smart [PRO] LED floodlights illuminating the pitch, providing annual electricity savings of 42,000 kW/h, with consumption reduced by 80% compared with the old system.

"Luigi Bergamelli" Youth Club Sports Field Références

"Luigi Bergamelli" Youth Club Sports Field

The historic football club ‘Unione Sportiva Scanzorosciate’ in the province of Bergamo, has joined the Football Innovation project, re-lighting its main training pitch. This installation features 28 Smart [PRO] LED fixtures, which save about 26,400 kWh and 14 tons of CO₂ every year. This is a gain for the club, in clean energy as well as costs.

Profiling
Solutions sur mesure pour vous
DES PRODUITS ET SOLUTIONS ADAPTÉ(E)S À VOS BESOINS
Erreur d'envoi de la demande.
Merci de réessayer plus tard !
Merci !
Votre demande a bien été envoyée