FILL OUT THE FORM TO SEND AN EMAIL

We point out that fields marked with an asterisk are mandatory *
MESSAGE
"Paride Tilesi" Stadium
Save in your list
Print

"Paride Tilesi" Stadium

DESCRIPTION

On 4th May 2018 the official opening ceremony took place, of the Paride Tilesi Stadium in Amatrice, which had been completely restored after a major earthquake two years earlier. GEWISS, in collaboration with Corus and as part of the Digital Sport Innovation project, was directly involved in the renovation of the lighting system, supplying (with special agreements) all the material needed to overhaul the electrical and lighting system, including energy management solutions and providing 56 Smart [PRO] floodlights with LED technology.

GALLERY

PRODUCTS

"Ciamaor" Sports Centre Projects

"Ciamaor" Sports Centre

Marebbe (or Mareo in the local language, Ladin) is a town in the province of Bolzano, with around 3,000 inhabitants. It sits at the foot of the famous Plan de Corones ski area. The lighting of Ciamaor sports centre was fully replaced by the team at Digital Sport Innovation, a platform offering integrated services to make any sports facility safer, more modern and efficient. The main pitch was fitted with 44 Smart [PRO] 2-module floodlights, with innovative LED technology offering constant, evenly distributed lighting in any weather.

11-a-Side Football Contexts

11-a-Side Football

GEWISS has developed a range of products for football facilities that provide safe electrical systems and more efficient and sustainable lighting. Our new pitch floodlight, for instance, is based on a modular structure that enables customisation on each project by rationalising the system as far as possible, meeting relevant legal requirements.

Sedriano Municipal Sports Centre Projects

Sedriano Municipal Sports Centre

A.C.D. Sedriano is an amateur football club playing in the first Milanese provincial division. On one of the pitches used by the first team at the town's municipal sports centre, Digital Sport Innovation stepped in to overhaul the entire lighting system. There are now 32 Smart [PRO] LED floodlights illuminating the pitch, providing annual electricity savings of 42,000 kW/h, with consumption reduced by 80% compared with the old system.

Profiling
Customized solutions for you
PRODUCTS AND SOLUTIONS FOR YOUR NEEDS
Error sending request.
Please try again later!
Thank you!
Your request has been sent successfully